This message is recorded at 8.00am Thursday 3rd June 2021.
The intake was re-opened on Tuesday evening 2nd June and Stockwater should be throughout ZONE 1 & 3 this morning.
We will assess surface flooding again this morning before releasing stockwater to ZONE 2 & 4.
It is most likely stockwater should be flowing throughout the scheme later today.
If you have any Infrastructure damage you would like to report, please get in touch with the operations team.
Thank you
Jamie Hamilton
WIL Operations Manager