Main Race with the Torlesse Range
in the background. This photo is taken looking west up the race
towards the Waimakariri River. December 1998

Compaction of the wide buttress
near the top of the terrace. Note the existing stock water race
at right. January 1999

New bridge on the main race.
January 1999

Forming the new buttress along
the terrace. Note how the use of long metal pipes allowed construction
to be carried out beside and over the fully operational existing
water race. February 1999

Existing water race and access
track. Note that the swamp at the toe of the slope has been excavated
down to river gravels in order to give a good bedding for the buttress
material. February 1999

The remains of the old control
gate near the intake. March 1999

The "Boat" (intake
and fish screen combined) during commissioning. August 1999

The new intake and the old tunnel
(note the commemorative plaque). This tunnel is now registered as
an "Historic Place". August 1999

Realignment of Main Race

The silt ponds are designed so
that water continues to flow on one side when the other is closed
off for cleaning. August 1999

Through the culvert
|