| CRC000585* |
Use up to 10.5m3/s from the Waimakariri River from two
intakes at Browns Rock 9m3/s can be used for
irrigation supply-
1.5 m3/s can be used for Eyre River
recharge |
18
November 2031 |
·
Usage of water must be monitored
·
Fish screens at intake sites must be operating
· Abstraction
of water shall be restricted when flow in the Waimakariri River
is less than 46.2m3/s |
| CRC000955 |
Place
a pipe under the bed of the Cust River, East of Swamp Road |
21
December 2001 |
·
Erosion must be monitored and control works carried
out as required |
| CRC001015 |
Place
a pipe under the bed of the Cust River at Barkers Road |
10
January 2005 |
None
|
| CRC952566 |
Disturb
the bed of the Waimakariri River in and around the Browns Rock
area to create a diversion of water to the intakes of a water
management scheme |
18
November 2031 |
·
Environment Canterbury must be notified 2 working
days before bed disturbance is undertaken
·
Vehicles and machinery shall minimise their entry
into river channels containing flowing water |
| CRC952567 |
Divert
flow from the Waimakariri River in and around the Browns Rock
area to maintain river flow at the intakes of a water management
scheme |
18
November 2031 |
None
|
| CRC952568 |
Construct
and use a proposed water intake structure and alter an existing
water intake structure in the bed of the Waimakariri River at
Browns Rock |
18
November 2031 |
·
Structural integrity of the works must be maintained
·
Erosion must be monitored and control works carried
out as required
· Fish
screens and fish bypass must be operating |
| CRC952570 |
Discharge
water and material from a settling pond at weekly intervals
onto land, into or onto the bed of the Waimakariri River and
into the water of the Waimakariri River-
Discharge rate of 30m3/s for one hour
per week beginning at 1.00pm on Wednesdays |
18
November 2031 |
·
Suspended sediment concentrations in the receiving
water must not increase by more than 50grams per m3
·
Sampling shall be carried out during the discharge
· Notices
stating the times of discharge shall be placed and maintained
in the river bed |
| CRC952571 |
Discharge
up to 3m3/s of water into the Eyre River for groundwater
recharge from August to May |
18
November 2031 |
· Discharge cannot
occur at times of high groundwater levels
· Discharge rates
must be recorded
· Monitor changes
in groundwater levels and quality
· Monitor the
water quality at the discharge points
· Consultation
with landowners must be carried out regarding the results of
the recharge trials |
| CRC952572 |
Construct
and use a water discharge structure in the bed of the Cust River
for the purpose of discharging water into the Cust River at
Starvation Hill Road |
18
November 2031 |
·
Structural integrity of the works must be maintained
·
Erosion must be monitored and control works carried
out as required |
| CRC952573 |
Construct
and use a water discharge structure in the Cust Main Drain River
for the purpose of discharging water into the Cust River, North
of Barkers Road |
18
November 2031 |
·
Structural integrity of the works must be maintained
·
Erosion must be monitored and control works carried
out as required |
| CRC952575 |
Construct
and use a water discharge structure in the bed of the Ashley
River for the purpose of discharging water into the Ashley River,
South East of O’Hallorans Road |
18
November 2031 |
·
Structural integrity of the works must be maintained
· Erosion
must be monitored and control works carried out as required |
| CRC952577 |
Construct
and use a water race structure, being an inverted syphon, in
and across the riverbed of the Cust River, West of Ngakuroa
Farm |
18
November 2031 |
·
Structural integrity of the works must be maintained
·
Erosion must be monitored and control works carried
out as required |
| CRC952578 |
Construct
and use a water race structure, being an inverted syphon, in
and across the bed of the Eyre River at Warren Road |
18
November 2031 |
·
Structural integrity of the works must be maintained
· Erosion
must be monitored and control works carried out as required
|
| CRC010487 |
Disturb
the bed of the Eyre River by installing a syphon under
the bed of the river, South of Wolffs Road |
3
November 2002 |
·
Structural integrity of the works must be maintained |